noCV
BEXTRACT-103 · Validate drafts

Validate source spans for every extracted material field

Practice briefTaskAdvanced

The provider returns a supplier address that appears nowhere in the document.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Grounding · Validation

Estimated field mix

  • Applied AI80%
  • Data engineering20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional procurement team receives inconsistent supplier documents. It wants draft records that staff can review without treating model output as authoritative accounting data.

Setup prerequisites

  • Author synthetic text invoices with ambiguous dates, currencies, and line items; use a deterministic provider double.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Require bounded source spans for material values.
  • Resolve spans against the exact source version.
  • Flag transformed values with their documented normalization rule.

Implementation constraints

  • Provider prose cannot substitute for source support.

Verification to include

  • Accept a supported normalized date.
  • Reject out-of-range spans and invented supplier values.

Deliverables

  • Source-grounding validator.

Rollout and recovery

Keep unsupported drafts blocked for review; retain safe failure categories.

Value of the work

For the engineer: Practice schema constraints, numerical checks, review workflows, and safe model boundaries.

For the team: Produce an inspectable extraction prototype that can reduce manual transcription while preserving review control.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.