noCV
BPROXY-109 · Verify proxy changes

Reload proxy configuration without dropping healthy in-flight requests

Practice briefTaskAdvanced

Configuration reloads close active report streams immediately.

Focused work estimate
3h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Operational networking

Estimated field mix

  • Networking60%
  • Site reliability40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional reporting API sits behind a reverse proxy. Clients see intermittent disconnects and incorrect origins after changes to keep-alive and forwarding headers.

Setup prerequisites

  • Create two loopback HTTP services and a local proxy with synthetic requests; no public scanning or external traffic.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Validate new configuration before activation.
  • Drain existing connections within a bounded deadline.
  • Reject invalid reloads while retaining the prior configuration.

Implementation constraints

  • Use only locally owned processes.

Verification to include

  • Reload during an active stream.
  • Submit invalid configuration and verify the old proxy remains usable.

Deliverables

  • Graceful reload behavior.

Rollout and recovery

Keep a tested prior configuration and an explicit drain timeout.

Value of the work

For the engineer: Practice HTTP intermediaries, connection lifetimes, and network failure isolation.

For the team: Provide a proxy contract that preserves request identity and releases resources predictably.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.