noCV
CCONFIG-109 · Recover gateway state

Expose edge-configuration rollback as a new desired revision

Practice briefStoryIntermediate

Operators lower the revision number to restore older values and gateways reject it as stale. Create a new revision carrying the prior values.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
Versioning · Recovery

Estimated field mix

  • Embedded and edge60%
  • Distributed systems40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional information-display gateways receive brightness schedules and cache limits. These settings affect only a software display emulator; no real devices, safety controls or customer data are used.

Setup prerequisites

  • Define synthetic configuration schema and supported device capabilities.
  • Implement local control-plane and gateway adapters with delayed messages.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Rollback increments revision
  • Prior values are copied explicitly
  • Current capability validation still applies

Implementation constraints

  • Preserve original revision history.

Verification to include

  • Roll back supported values
  • Attempt rollback containing now-unsupported field

Deliverables

  • Rollback command and history cases

Rollout and recovery

Retain current settings if rollback validation fails.

Value of the work

For the engineer: Practice desired/reported state, compatibility and rollback.

For the team: Inspect whether remote configuration preserves working settings through offline and partial outcomes.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.