noCV
CLI-107 · Handle an interrupted release

Prevent a second release process from using the same checkout

Practice briefBugAdvanced

Two terminals started preparation within a second and both used the same temporary filenames. Add an exclusive lease for mutation commands with inspectable ownership.

Focused work estimate
2h + prerequisites
Priority in the scenario
High
Engineering practice
Process coordination · Race conditions · Operational tooling

Estimated field mix

  • Developer tooling100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A team maintains six related packages. Release notes, version changes, and tags are copied between a spreadsheet and a terminal; a failed upload recently left two packages ahead of their dependents. The exercise uses temporary repositories and a fake registry.

Setup prerequisites

  • Create a temporary Git repository with three related fixture packages.
  • Use a local registry double; no publishing credentials are required.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Exactly one of two concurrent preparation commands obtains the repository lease.
  • The loser exits before replacing a file and reports the existing operation ID.
  • Stale-lease recovery is an explicit command that verifies the recorded operation is no longer active.

Implementation constraints

  • Do not decide lease ownership from a PID alone; include an operation token.
  • Read-only commands remain usable while a lease exists.

Verification to include

  • Start two local fixture processes behind a barrier and count successful mutations.
  • Simulate a stale lease and verify ordinary preparation refuses it until explicit recovery.

Deliverables

  • Lease implementation and concurrent-process test

Rollout and recovery

Require leases for all mutation commands together; rollback by disabling mutations until both versions agree on the lease format.

Value of the work

For the engineer: Practice CLI contracts, graph reasoning, filesystem safety, and recovery from partial work.

For the team: Review how an engineer makes release changes inspectable and recoverable before they affect consumers.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.