noCV
CLSP-109 · Handle client interruption

Handle malformed language-server messages without losing healthy documents

Practice briefBugAdvanced

A malformed request resets the whole server and loses open buffers. Isolate parsing and protocol failures.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Error isolation · Input security

Estimated field mix

  • Compiler and language tooling60%
  • Security40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional config editor Hazel speaks a bounded subset of the Language Server Protocol through a local transport adapter. Use a tiny declared configuration grammar and synthetic documents.

Setup prerequisites

  • Define the supported protocol subset and configuration grammar.
  • Create synthetic open/change/close messages and workspace fixtures.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Invalid message gets bounded error
  • Healthy documents remain intact
  • Transport stays usable when framing permits

Implementation constraints

  • Never log full document contents on parse failure.

Verification to include

  • Send valid request after malformed one
  • Send oversized message

Deliverables

  • Protocol error boundary and cases

Rollout and recovery

Close only the offending transport when framing is unrecoverable.

Value of the work

For the engineer: Practice protocol ordering and document-safe editing.

For the team: Inspect whether editor assistance preserves current user text and file boundaries.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.