noCV
CTIMER-107 · Control job execution

Recover due edge jobs after restart without a catch-up storm

Practice briefBugExpert

Restarting after a long pause runs every missed interval at once. Persist minimal schedule state and coalesce missed runs.

Focused work estimate
4h + prerequisites
Priority in the scenario
High
Engineering practice
Persistence · Scheduling

Estimated field mix

  • Embedded and edge70%
  • Storage systems30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional kiosk software schedules cache refresh and display housekeeping. Build a software clock and job adapter; do not control real machinery or purchase hardware.

Setup prerequisites

  • Implement injected wall and monotonic clocks.
  • Create synthetic jobs with controllable completion and failure.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • At most declared catch-up work runs
  • Future schedule resumes predictably
  • Unknown persisted version fails safely

Implementation constraints

  • Define which jobs may be skipped because they are housekeeping.

Verification to include

  • Restart after one missed run
  • Restart after many missed intervals

Deliverables

  • Recovery policy and restart fixtures

Rollout and recovery

Start housekeeping from a fresh delayed schedule if state is unreadable.

Value of the work

For the engineer: Practice timer semantics, cancellation and bounded scheduling.

For the team: Inspect predictable edge resource use and honest execution status.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.