noCV
CUPDATE-104 · Stage and activate

Write edge-update images only into the inactive simulated slot

Practice briefTaskAdvanced

Update copying overwrites the currently selected image before validation finishes. Restrict staging to the inactive slot.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Isolation · Filesystem

Estimated field mix

  • Embedded and edge50%
  • Storage systems50%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional information kiosks receive small generated image blobs through a local update adapter. Simulate slots and boot outcomes in software; do not flash hardware or execute image contents.

Setup prerequisites

  • Generate inert byte images with manifests and development-only signing fixtures.
  • Implement simulated boot success failure and power-cut points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Active slot remains byte-identical
  • Inactive slot gets candidate bytes
  • Failed write leaves active selection unchanged

Implementation constraints

  • Slot paths must stay inside the fixture root.

Verification to include

  • Stage valid image
  • Fail copy midway

Deliverables

  • Slot writer and isolation cases

Rollout and recovery

Abandon inactive candidate and retain active slot.

Value of the work

For the engineer: Practice update state machines and recoverable activation.

For the team: Inspect whether an engineer can prevent partial rollout from stranding devices under declared conditions.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.