DREL-104 · Control change and failure

Gate promotion on database compatibility

Practice briefChoreIntermediate

A release expects a renamed column while rollback still expects the old one, making the nominal rollback artifact unusable.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Database migrations · Compatibility · Rollback planning

Estimated field mix

  • DevOps60%
  • Database engineering40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional scheduling API is rebuilt separately for test, staging, and production-like local environments. The resulting images differ, release notes list the branch instead of the artifact, and rollback rebuilds old source with new dependencies. Use a local registry simulator and synthetic deployments; no cluster or customer traffic is supplied.

Setup prerequisites

  • Artifact digests
  • Release states
  • Health checks

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Manifest declares required and provided schema compatibility window
  • Promotion checks current environment schema before deployment
  • Rollback target is validated against post-migration schema

Implementation constraints

  • Use fixture schema versions; do not execute migrations against a real database.

Verification to include

  • Promote an expand-compatible release and validate its rollback target.
  • Attempt a contract-first release and show the gate identifies the incompatible direction.

Deliverables

  • Schema compatibility gate and rollout matrix

Rollout and recovery

Require expand, migrate, contract phases for destructive changes.

Value of the work

For the engineer: Practice immutable promotion, release authority, compatibility gates, canaries, and rollback.

For the team: Review a delivery flow that can identify exactly what is running and restore a known artifact without rebuilding it.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.