noCV
SCONCUR-103 · Establish the machine contract

Close the lost-wakeup gap between predicate and sleep

Practice briefStoryIntermediate

A producer signals just before a worker begins waiting; queued work then sleeps until another submission arrives.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Condition variables · Happens-before · Concurrency testing

Estimated field mix

  • Systems programming65%
  • Quality engineering35%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional image-indexing utility runs CPU-only synthetic jobs through a Rust worker pool. Its prototype loses wakeups, blocks shutdown, and treats cancellation as completion. Build a local library and deterministic concurrency harness; image content, GPU work, and production deployment are excluded.

Setup prerequisites

  • Mutexes and condition variables
  • Atomics
  • Thread lifecycle

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Workers test the queue predicate under the same synchronization boundary as waiting
  • Spurious wakeups preserve correctness
  • One job is claimed by one worker

Implementation constraints

  • Document the predicate, mutex, and notification order in code comments beside the wait loop.

Verification to include

  • Exercise enqueue before, during, and after worker wait.
  • Force the historical interleaving and prove the queued job completes without a second signal.

Deliverables

  • Correct wait loop and deterministic lost-wakeup test

Rollout and recovery

Run the old and new pools against the same scheduler trace before switching.

Value of the work

For the engineer: Practice happens-before reasoning, ownership transfer, cancellation and liveness testing.

For the team: Review a worker primitive whose overload and shutdown behavior are predictable before it supports build or media workloads.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.