ABATCH-106 · Coordinate parallel outcomes

Finalize aggregates only from the frozen required check set

Practice briefTaskExpert

An optional checker finishes quickly and accidentally satisfies a counter-based completion condition while a required checker is missing.

Focused work estimate
5h + prerequisites
Priority in the scenario
High
Engineering practice
Aggregation · Set invariants

Estimated field mix

  • Distributed systems60%
  • Backend40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional vendor portal runs format, policy and duplicate checks in parallel. A slow checker blocks completion, while duplicate callbacks can produce contradictory final summaries.

Setup prerequisites

  • Create synthetic document identities and three fake check providers.
  • No real risk scoring, hiring decisions or candidate execution is included.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Evaluate completeness by exact required identities.
  • Compute aggregate state from validated immutable check facts.
  • Reject finalization when required results are missing or conflicting.

Implementation constraints

  • Define aggregate output as review status, never an opaque hire/reject score.

Verification to include

  • Finish all required checks and produce the expected status.
  • Complete extra optional checks while omitting one required check and block completion.

Deliverables

  • Aggregate reducer and completeness tests

Rollout and recovery

Enable guarded finalization before publishing results; retain pending state on missing authority.

Value of the work

For the engineer: Practice fan-out/fan-in, deadline policies and immutable aggregation.

For the team: Review trustworthy partial-result handling and controllable parallel work.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.