ACLAIM-109 · Recover stale work

Measure assignment lock behavior without claiming a throughput guarantee

Practice briefChoreIntermediate

Operators need to choose a polling interval and concurrency limit based on observed contention in the local prototype.

Focused work estimate
3h + prerequisites
Priority in the scenario
Medium
Engineering practice
Database observability · Concurrency testing

Estimated field mix

  • Database engineering50%
  • Performance engineering30%
  • Quality engineering20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional inspection service assigns review jobs to staff. Polling clients sometimes claim the same job and a disconnected client can finish work after reassignment.

Setup prerequisites

  • Create synthetic jobs and two independent database clients.
  • Use explicit state methods and an injected clock.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Record database/runtime versions and synthetic job count.
  • Measure lock waits and claim outcomes at fixed concurrency levels.
  • Keep correctness assertions enabled during every run.

Implementation constraints

  • Repeat each local condition three times; results describe only that environment.

Verification to include

  • Run identical workloads at one and four pollers and record observations.
  • Hold a long transaction and verify timeouts remain bounded without duplicate claims.

Deliverables

  • Contention probe and observation report

Rollout and recovery

Use observations to propose conservative local limits; restore lower concurrency if claim failures rise.

Value of the work

For the engineer: Practice database concurrency, leases and transactional invariants.

For the team: Review whether assignment authority remains reliable during contention and recovery.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.