AINGEST-109 · Recover ingestion gaps

Verify a telemetry backfill against immutable aggregate snapshots

Practice briefTaskExpert

A conversion fix requires rebuilding a week of energy totals without obscuring what the previous dashboard showed.

Focused work estimate
6h + prerequisites
Priority in the scenario
Medium
Engineering practice
Backfills · Data reconciliation

Estimated field mix

  • Data engineering80%
  • Database engineering20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional energy dashboard receives hourly device batches. Corrupt archives and late corrections leave operators unsure which readings reached reports.

Setup prerequisites

  • Create synthetic device batches and local object-store fixtures.
  • Understand checksums and bounded streaming.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Build a new aggregate generation from named manifests.
  • Compare counts, units and totals against frozen previous output.
  • Atomically select the generation only after review.

Implementation constraints

  • Use a synthetic seven-day corpus with declared correction cases.

Verification to include

  • Backfill the corpus and reconcile every changed aggregate.
  • Interrupt before activation and keep previous dashboard reads consistent.

Deliverables

  • Backfill runner and generation difference report

Rollout and recovery

Activate one synthetic tenant; restore the old generation pointer on discrepancy.

Value of the work

For the engineer: Practice batch integrity, replay and data-quality boundaries.

For the team: Review whether operational data can be traced, corrected and recovered.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.