noCV
AMERGE-110 · Recover interrupted synchronization

Show sync completion separately from resolved inspection conflicts

Practice briefTaskFoundational

A tablet says all synced even though uploaded changes contain unresolved conflicts and a pending attachment.

Focused work estimate
1h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Distributed UX · State semantics

Estimated field mix

  • Mobile50%
  • Distributed systems50%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional field team inspects equipment with intermittent connectivity. Two tablets can edit the same checklist and an old upload may restore a deleted finding.

Setup prerequisites

  • Create two local client-state simulators and a synthetic inspection API.
  • Use fabricated notes and local attachment bytes.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Report transport acknowledgement, conflict state and attachment state separately.
  • Keep rejected operations visible with safe reasons.
  • Never equate uploaded data with an approved inspection.

Implementation constraints

  • Use a local status projection with accessible plain-language labels.

Verification to include

  • Display a fully acknowledged conflict-free synthetic inspection.
  • Acknowledge a conflicting batch and retain unresolved status.

Deliverables

  • Sync status contract and state examples

Rollout and recovery

Publish precise status labels; restore prior layout without collapsing distinct states.

Value of the work

For the engineer: Practice offline synchronization, causal revisions and conflict resolution.

For the team: Review whether field work survives disconnection without hiding conflicting observations.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.