noCV
BAPIBULK-106 · Process bounded work

Define cancellation after some items have committed

Practice briefTaskAdvanced

Clients assume cancelling an import undoes all previous item updates.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
State transitions · API semantics

Estimated field mix

  • API design60%
  • Distributed systems40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional catalog API needs to accept imports too large for one synchronous request. Partners need to distinguish accepted work, completed items, and recoverable failures.

Setup prerequisites

  • Create a local API and worker double with synthetic catalog records and controlled interruption points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Document cancellation as stopping future work unless compensation exists.
  • Preserve committed outcomes.
  • Resolve cancellation-versus-completion races explicitly.

Implementation constraints

  • Do not silently roll back unrelated later changes.

Verification to include

  • Cancel after two items commit.
  • Race cancellation with final completion and produce one terminal state.

Deliverables

  • Cancellation contract.

Rollout and recovery

Expose committed counts before accepting cancellation.

Value of the work

For the engineer: Practice asynchronous resource contracts, partial outcomes, and idempotent operations.

For the team: Provide predictable bulk integration behavior without ambiguous success or repeated effects.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.