noCV
BAPIVER-104 · Implement coexistence

Use Problem Details for versioned validation failures

Practice briefTaskIntermediate

Partners parse changing human messages to detect invalid warehouse filters.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Error design

Estimated field mix

  • API design80%
  • Security20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional inventory platform must replace a legacy availability response. Existing partners upgrade on different schedules, and the team needs a versioned transition.

Setup prerequisites

  • Create two local API versions and synthetic partner clients with different upgrade schedules; no real partner traffic.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Publish stable problem types and field paths.
  • Keep instance and request identifiers safe.
  • Version any materially changed error semantics.

Implementation constraints

  • Exclude stack traces and internal database details.

Verification to include

  • Validate a malformed filter in both versions.
  • Verify cross-tenant denial reveals no private identifiers.

Deliverables

  • Error contract examples.

Rollout and recovery

Add structured fields compatibly and document client handling.

Value of the work

For the engineer: Practice public-contract design, compatible evolution, and client lifecycle management.

For the team: Provide a predictable migration that keeps supported integrations inspectable and recoverable.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.