noCV
BPROXY-110 · Verify proxy changes

Write a proxy incident checklist by connection stage

Practice briefChoreFoundational

Operators need to distinguish header rejection, pool waiting, and upstream disconnects.

Focused work estimate
1h + prerequisites
Priority in the scenario
Low
Engineering practice
Runbooks

Estimated field mix

  • Site reliability50%
  • Networking50%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional reporting API sits behind a reverse proxy. Clients see intermittent disconnects and incorrect origins after changes to keep-alive and forwarding headers.

Setup prerequisites

  • Create two loopback HTTP services and a local proxy with synthetic requests; no public scanning or external traffic.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Map safe failure categories to checks.
  • Include current timeout and pool settings.
  • Document bounded rollback and drain commands.

Implementation constraints

  • Do not capture request bodies or credentials.

Verification to include

  • Diagnose a synthetic stale connection.
  • Distinguish pool overload from upstream application failure.

Deliverables

  • Proxy support runbook.

Rollout and recovery

Ship with configuration changes and verify it during local rehearsal.

Value of the work

For the engineer: Practice HTTP intermediaries, connection lifetimes, and network failure isolation.

For the team: Provide a proxy contract that preserves request identity and releases resources predictably.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.