noCV
CROUTE-109 · Recover interruptions

Explain partial route synchronization per visit

Practice briefStoryIntermediate

A global Sync complete banner hides a failed visit. Show per-visit pending, conflicted, and acknowledged states.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
State projection · UX

Estimated field mix

  • Mobile80%
  • API design20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional maintenance coordinator Elm dispatches non-safety-critical inspection visits. Implement a mobile application in an emulator with local API stubs; physical devices and credentials are unnecessary.

Setup prerequisites

  • Create synthetic visits and a local sync adapter.
  • Provide controllable connectivity and process-restart simulation.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Global summary counts unresolved visits
  • Each failure has action
  • Success follows acknowledgement

Implementation constraints

  • Do not infer sync from an empty in-memory queue.

Verification to include

  • Sync mixed outcomes
  • Restart with persisted pending work

Deliverables

  • Sync summary and recovery checks

Rollout and recovery

Hide global success if summaries disagree.

Value of the work

For the engineer: Practice durable mobile state and explicit sync conflicts.

For the team: Inspect how an engineer protects field work during disconnection.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.