noCV
CTIMER-109 · Recover scheduler state

Report emulated edge-job lateness separately from duration

Practice briefChoreIntermediate

A slow-started job is blamed on execution time because metrics combine queue delay and work duration. Separate them.

Focused work estimate
1h 45m + prerequisites
Priority in the scenario
Low
Engineering practice
Observability · Measurement

Estimated field mix

  • Embedded and edge50%
  • Performance engineering30%
  • Site reliability20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional kiosk software schedules cache refresh and display housekeeping. Build a software clock and job adapter; do not control real machinery or purchase hardware.

Setup prerequisites

  • Implement injected wall and monotonic clocks.
  • Create synthetic jobs with controllable completion and failure.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Lateness measures due-to-start
  • Duration measures start-to-finish
  • Clock corrections do not corrupt elapsed metrics

Implementation constraints

  • Report synthetic local observations, not hardware deadlines.

Verification to include

  • Queue then execute job
  • Change wall clock during execution

Deliverables

  • Scheduler metric schema and cases

Rollout and recovery

Hide derived latency fields if clock provenance is missing.

Value of the work

For the engineer: Practice timer semantics, cancellation and bounded scheduling.

For the team: Inspect predictable edge resource use and honest execution status.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.