noCV
CUPDATE-105 · Stage and activate

Record edge-update activation intent before changing the boot selector

Practice briefBugExpert

A power cut during selector change leaves no recoverable activation decision. Journal intent and candidate identity.

Focused work estimate
4h + prerequisites
Priority in the scenario
High
Engineering practice
Crash consistency · State machines

Estimated field mix

  • Storage systems50%
  • Embedded and edge50%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional information kiosks receive small generated image blobs through a local update adapter. Simulate slots and boot outcomes in software; do not flash hardware or execute image contents.

Setup prerequisites

  • Generate inert byte images with manifests and development-only signing fixtures.
  • Implement simulated boot success failure and power-cut points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Intent is durable before selector change
  • Recovery identifies pending activation
  • Repeated recovery is deterministic

Implementation constraints

  • Do not execute image bytes; use boot-result stubs.

Verification to include

  • Cut before selector update
  • Cut after selector update

Deliverables

  • Activation journal and cut-point matrix

Rollout and recovery

Restore prior validated selector when activation state is ambiguous.

Value of the work

For the engineer: Practice update state machines and recoverable activation.

For the team: Inspect whether an engineer can prevent partial rollout from stranding devices under declared conditions.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.