noCV
SCONCUR-108 · Prove recovery and handoff

Drain accepted jobs without hanging process shutdown

Practice briefChoreAdvanced

Shutdown closes submissions but waits forever for a worker blocked on an external test double that never returns.

Focused work estimate
4h + prerequisites
Priority in the scenario
High
Engineering practice
Graceful shutdown · Recovery · State machines

Estimated field mix

  • Systems programming70%
  • Site reliability30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional image-indexing utility runs CPU-only synthetic jobs through a Rust worker pool. Its prototype loses wakeups, blocks shutdown, and treats cancellation as completion. Build a local library and deterministic concurrency harness; image content, GPU work, and production deployment are excluded.

Setup prerequisites

  • Mutexes and condition variables
  • Atomics
  • Thread lifecycle

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Shutdown defines stop-accepting, drain, cancel, and terminal states
  • A deadline reports unfinished job identities without detaching live threads
  • Repeated shutdown calls return the same terminal outcome

Implementation constraints

  • Use controlled local jobs; do not kill threads or the host process to simulate recovery.

Verification to include

  • Drain a pool whose jobs complete before the deadline.
  • Block one job past the deadline and confirm bounded return with an unresolved record.

Deliverables

  • Shutdown protocol and stuck-job test

Rollout and recovery

Callers keep the old process exit path until they handle unresolved shutdown results.

Value of the work

For the engineer: Practice happens-before reasoning, ownership transfer, cancellation and liveness testing.

For the team: Review a worker primitive whose overload and shutdown behavior are predictable before it supports build or media workloads.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.