noCV
SCONCUR-109 · Prove recovery and handoff

Capture a concurrency failure without megabytes of logs

Practice briefTaskExpert

A rare stall produces per-poll logs from every worker, changing timing and obscuring the last useful state transition.

Focused work estimate
6h + prerequisites
Priority in the scenario
High
Engineering practice
Diagnostics · Ring buffers · Privacy

Estimated field mix

  • Systems programming65%
  • Site reliability35%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional image-indexing utility runs CPU-only synthetic jobs through a Rust worker pool. Its prototype loses wakeups, blocks shutdown, and treats cancellation as completion. Build a local library and deterministic concurrency harness; image content, GPU work, and production deployment are excluded.

Setup prerequisites

  • Mutexes and condition variables
  • Atomics
  • Thread lifecycle

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Record a bounded ring of queue and worker transitions
  • Events use monotonic sequence and synthetic job identity
  • Snapshot identifies dropped diagnostic events

Implementation constraints

  • Do not record job payloads, thread stack memory, or unbounded labels.

Verification to include

  • Reconstruct a normal claim-to-completion path from the ring.
  • Overflow the ring during the forced deadlock trace and retain an explicit loss marker.

Deliverables

  • Bounded trace recorder and stall diagnostic

Rollout and recovery

Enable the recorder only for the local harness until overhead is measured.

Value of the work

For the engineer: Practice happens-before reasoning, ownership transfer, cancellation and liveness testing.

For the team: Review a worker primitive whose overload and shutdown behavior are predictable before it supports build or media workloads.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.