noCV
SIPC-109 · Prove recovery and handoff

Reconcile pending operations after supervisor restart

Practice briefTaskExpert

The supervisor restarts with requests marked running but no in-memory correlation table and no proof whether workers completed them.

Focused work estimate
6h + prerequisites
Priority in the scenario
High
Engineering practice
Crash recovery · Journaling · Idempotency

Estimated field mix

  • Systems programming60%
  • Storage systems40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional document converter launches local sandbox substitutes as child processes. Its prototype parses newline-delimited output, leaks descriptors, and retries requests after ambiguous worker exits. Create a Rust supervisor and deterministic worker fixtures; no document content or production sandbox is supplied.

Setup prerequisites

  • File descriptors
  • Framing
  • Process signals

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Persist stable operation identity and last acknowledged state before dispatch
  • Recovery queries a deterministic worker ledger when supported
  • Unresolved operations remain visible and are never silently marked failed

Implementation constraints

  • The local ledger contains synthetic identities and bounded metadata, not document bodies.

Verification to include

  • Restart after acknowledgement and restore the completed result.
  • Restart during an unqueryable effect and retain UNKNOWN for review.

Deliverables

  • Pending-operation journal and restart drill

Rollout and recovery

Require reconciliation support before enabling autonomous retry.

Value of the work

For the engineer: Practice IPC contracts, resource inheritance, process supervision and ambiguous completion.

For the team: Review a local worker boundary that contains crashes and preserves request outcomes before connecting an isolated execution provider.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.