noCV
BAPIVER-105 · Implement coexistence

Preserve idempotency semantics across client version upgrades

Practice briefTaskAdvanced

A client retries an inventory reservation with the same key after upgrading its API version.

Focused work estimate
3h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Idempotency · Compatibility

Estimated field mix

  • API design50%
  • Distributed systems30%
  • Backend20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional inventory platform must replace a legacy availability response. Existing partners upgrade on different schedules, and the team needs a versioned transition.

Setup prerequisites

  • Create two local API versions and synthetic partner clients with different upgrade schedules; no real partner traffic.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Define whether keys bind to normalized domain intent or transport version.
  • Reject conflicting reuse consistently.
  • Prevent duplicate domain effects across supported routes.

Implementation constraints

  • Document the chosen scope rather than silently translating incompatible requests.

Verification to include

  • Replay equivalent supported requests under the chosen policy.
  • Reject a changed reservation under the same key.

Deliverables

  • Cross-version idempotency contract.

Rollout and recovery

Retain original operation facts during migration.

Value of the work

For the engineer: Practice public-contract design, compatible evolution, and client lifecycle management.

For the team: Provide a predictable migration that keeps supported integrations inspectable and recoverable.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.