noCV
CTIMER-110 · Recover scheduler state

Provide a read-only edge scheduler timeline for recovery diagnosis

Practice briefStoryIntermediate

Engineers cannot explain why a job was skipped after restart. Export bounded state transitions without running jobs.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
Diagnostics · State machines

Estimated field mix

  • Developer tooling50%
  • Embedded and edge50%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional kiosk software schedules cache refresh and display housekeeping. Build a software clock and job adapter; do not control real machinery or purchase hardware.

Setup prerequisites

  • Implement injected wall and monotonic clocks.
  • Create synthetic jobs with controllable completion and failure.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Timeline identifies schedule and attempt IDs
  • Skipped reasons are explicit
  • Inspection causes no callbacks or writes

Implementation constraints

  • Omit payloads and fixture file contents.

Verification to include

  • Inspect completed sequence
  • Inspect exhausted and skipped job

Deliverables

  • Timeline inspector and side-effect checks

Rollout and recovery

Disable inspection fields that expose task payloads.

Value of the work

For the engineer: Practice timer semantics, cancellation and bounded scheduling.

For the team: Inspect predictable edge resource use and honest execution status.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.