noCV
CUPDATE-106 · Stage and activate

Mark an edge-update candidate healthy only after simulated boot confirmation

Practice briefTaskIntermediate

Merely selecting a slot labels the update successful. Require an explicit boot acknowledgement from the emulator.

Focused work estimate
2h 15m + prerequisites
Priority in the scenario
High
Engineering practice
State transitions · Time

Estimated field mix

  • Embedded and edge70%
  • Site reliability30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional information kiosks receive small generated image blobs through a local update adapter. Simulate slots and boot outcomes in software; do not flash hardware or execute image contents.

Setup prerequisites

  • Generate inert byte images with manifests and development-only signing fixtures.
  • Implement simulated boot success failure and power-cut points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Selection yields pending health
  • Confirmation marks success
  • Missing confirmation reaches bounded failure state

Implementation constraints

  • Health means only the declared simulator check.

Verification to include

  • Confirm successful boot
  • Omit confirmation past deadline

Deliverables

  • Health transition and timer cases

Rollout and recovery

Keep prior slot available until health acknowledgement commits.

Value of the work

For the engineer: Practice update state machines and recoverable activation.

For the team: Inspect whether an engineer can prevent partial rollout from stranding devices under declared conditions.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.