noCV
DCI-110 · Operate and improve

Hand off CI ownership with a safe degraded mode

Practice briefBugIntermediate

When the cache or check provider is unavailable, maintainers do not know which failures can fall back and which must block merging.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Runbooks · Degraded operation · Ownership handoff

Estimated field mix

  • DevOps70%
  • Site reliability30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional TypeScript monorepo has twelve packages and a local CI simulator. Pull requests wait for redundant work, stale caches occasionally pass broken changes, and superseded runs continue consuming executors. Create synthetic package graphs and fake check APIs; no hosted CI credentials or production repositories are supplied.

Setup prerequisites

  • Dependency graphs
  • Process exit codes
  • Test isolation

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Runbook names owners, dependencies, alerts, and escalation conditions
  • Cache outage falls back to uncached required checks
  • Check-reporting uncertainty blocks eligibility while preserving local results

Implementation constraints

  • Do not claim merge protection changes; the exercise documents the intended integration contract.

Verification to include

  • Rehearse cache loss and complete an uncached run.
  • Lose final check acknowledgement and follow the block-and-reconcile path.

Deliverables

  • CI runbook and two recovery rehearsals

Rollout and recovery

Review the runbook with a second engineer before adopting the workflow.

Value of the work

For the engineer: Practice treating CI as a versioned delivery system with correctness, latency, and recovery constraints.

For the team: Review a pipeline that reduces wasted compute without allowing stale or skipped checks to approve changes.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.