noCV
BAPIBULK-110 · Support clients

Publish a bulk client example covering timeout and partial failure

Practice briefChoreFoundational

Partners have only a happy-path example that treats HTTP acceptance as completion.

Focused work estimate
1h 30m + prerequisites
Priority in the scenario
Low
Engineering practice
SDK design · Documentation

Estimated field mix

  • Developer tooling50%
  • API design50%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional catalog API needs to accept imports too large for one synchronous request. Partners need to distinguish accepted work, completed items, and recoverable failures.

Setup prerequisites

  • Create a local API and worker double with synthetic catalog records and controlled interruption points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Show admission retry with one idempotency key.
  • Poll to a terminal operation state.
  • Inspect item errors and retained committed results.

Implementation constraints

  • Use local mock data and no credentials.

Verification to include

  • Run a successful example.
  • Run timeout, partial failure, and cancellation examples without duplicate submissions.

Deliverables

  • Executable bulk client guide.

Rollout and recovery

Version the example with the operation contract.

Value of the work

For the engineer: Practice asynchronous resource contracts, partial outcomes, and idempotent operations.

For the team: Provide predictable bulk integration behavior without ambiguous success or repeated effects.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.