noCV
BAPIVER-106 · Implement coexistence

Generate SDK migration examples from packaged client versions

Practice briefTaskIntermediate

Migration documentation uses methods not present in the released client archive.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
SDK lifecycle · Documentation

Estimated field mix

  • Developer tooling60%
  • API design40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional inventory platform must replace a legacy availability response. Existing partners upgrade on different schedules, and the team needs a versioned transition.

Setup prerequisites

  • Create two local API versions and synthetic partner clients with different upgrade schedules; no real partner traffic.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Compile old and new examples against local packaged clients.
  • Show equivalent availability and error handling.
  • Document changed optional and nullable fields.

Implementation constraints

  • Use local archives and mock servers only.

Verification to include

  • Run both documented examples.
  • Detect a snippet importing a removed method.

Deliverables

  • Executable SDK migration examples.

Rollout and recovery

Publish examples with the matching contract revision.

Value of the work

For the engineer: Practice public-contract design, compatible evolution, and client lifecycle management.

For the team: Provide a predictable migration that keeps supported integrations inspectable and recoverable.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.