noCV
CUPDATE-107 · Stage and activate

Roll back failed edge-update boots without retry loops

Practice briefStoryAdvanced

A failing candidate is selected repeatedly on each restart. Persist failed-candidate disposition and restore the known-good slot.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Recovery · Failure handling

Estimated field mix

  • Embedded and edge60%
  • Site reliability40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional information kiosks receive small generated image blobs through a local update adapter. Simulate slots and boot outcomes in software; do not flash hardware or execute image contents.

Setup prerequisites

  • Generate inert byte images with manifests and development-only signing fixtures.
  • Implement simulated boot success failure and power-cut points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Failed candidate does not auto-reactivate
  • Prior slot is selected
  • No valid fallback produces explicit recovery-required state

Implementation constraints

  • Do not label fallback existence without validating its metadata.

Verification to include

  • Fail candidate boot
  • Invalidate both slot manifests

Deliverables

  • Rollback coordinator and failure cases

Rollout and recovery

Stop automatic activation when no validated fallback exists.

Value of the work

For the engineer: Practice update state machines and recoverable activation.

For the team: Inspect whether an engineer can prevent partial rollout from stranding devices under declared conditions.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.