noCV
SCONCUR-110 · Prove recovery and handoff

Publish the worker-pool contract and benchmark limits

Practice briefBugIntermediate

A build tool and a request server both plan to reuse the pool despite different fairness, blocking, and shutdown requirements.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Benchmarking · Documentation · Capacity planning

Estimated field mix

  • Systems programming70%
  • Developer tooling30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional image-indexing utility runs CPU-only synthetic jobs through a Rust worker pool. Its prototype loses wakeups, blocks shutdown, and treats cancellation as completion. Build a local library and deterministic concurrency harness; image content, GPU work, and production deployment are excluded.

Setup prerequisites

  • Mutexes and condition variables
  • Atomics
  • Thread lifecycle

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Document supported job behavior and prohibited blocking assumptions
  • Report throughput, queue wait, memory, and shutdown duration for declared workloads
  • List cases where a runtime-native executor is preferable

Implementation constraints

  • Do not generalize results beyond the recorded machine and workload profiles.

Verification to include

  • Reproduce one CPU-bound and one mixed-duration benchmark from a clean checkout.
  • Run the unsupported permanently blocking job and confirm the guide predicts the outcome.

Deliverables

  • Contract, benchmark manifest, and adoption checklist

Rollout and recovery

Require each adopter to select and verify a workload profile.

Value of the work

For the engineer: Practice happens-before reasoning, ownership transfer, cancellation and liveness testing.

For the team: Review a worker primitive whose overload and shutdown behavior are predictable before it supports build or media workloads.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.