SIPC-110 · Prove recovery and handoff

Document the IPC boundary for a future isolated provider

Practice briefBugIntermediate

The local child-process harness is about to be mistaken for a production candidate-code sandbox.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Provider interfaces · Security boundaries · Documentation

Estimated field mix

  • Systems programming70%
  • Platform engineering30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional document converter launches local sandbox substitutes as child processes. Its prototype parses newline-delimited output, leaks descriptors, and retries requests after ambiguous worker exits. Create a Rust supervisor and deterministic worker fixtures; no document content or production sandbox is supplied.

Setup prerequisites

  • File descriptors
  • Framing
  • Process signals

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Document framing, resource limits, process identity, shutdown, and unresolved outcomes
  • State which isolation guarantees the local supervisor does not provide
  • Define the provider contract a hardened external executor must satisfy

Implementation constraints

  • Do not claim namespace, secret, network, or host isolation from ordinary child processes.

Verification to include

  • Reproduce the local crash and restart drill from the guide.
  • Attempt to select the local adapter under a production configuration and require fail-closed behavior.

Deliverables

  • IPC contract and explicit production boundary note

Rollout and recovery

Keep the local supervisor restricted to synthetic development fixtures.

Value of the work

For the engineer: Practice IPC contracts, resource inheritance, process supervision and ambiguous completion.

For the team: Review a local worker boundary that contains crashes and preserves request outcomes before connecting an isolated execution provider.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.