noCV
BAPIVER-107 · Manage deprecation

Expose deprecation signals without breaking successful responses

Practice briefStoryIntermediate

Partners need machine-readable notice that the old version has a planned sunset.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
API lifecycle

Estimated field mix

  • API design100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional inventory platform must replace a legacy availability response. Existing partners upgrade on different schedules, and the team needs a versioned transition.

Setup prerequisites

  • Create two local API versions and synthetic partner clients with different upgrade schedules; no real partner traffic.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Document deprecation metadata and dates.
  • Keep response behavior compatible during support.
  • Link a versioned migration guide.

Implementation constraints

  • Dates are fictional scenario inputs and must be labeled in fixtures.

Verification to include

  • Read a legacy response with deprecation metadata.
  • Verify the new version does not carry an incorrect retirement notice.

Deliverables

  • Deprecation response contract.

Rollout and recovery

Enable notice before any retirement gate.

Value of the work

For the engineer: Practice public-contract design, compatible evolution, and client lifecycle management.

For the team: Provide a predictable migration that keeps supported integrations inspectable and recoverable.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.