noCV
CUPDATE-110 · Handle local rollout outcomes

Report edge-update stages without overstating fleet success

Practice briefStoryIntermediate

Dashboard counts downloaded images as updated kiosks. Project download, staged, boot-pending, healthy and rolled-back separately.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
Reporting · State projection

Estimated field mix

  • Frontend50%
  • Embedded and edge30%
  • Site reliability20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional information kiosks receive small generated image blobs through a local update adapter. Simulate slots and boot outcomes in software; do not flash hardware or execute image contents.

Setup prerequisites

  • Generate inert byte images with manifests and development-only signing fixtures.
  • Implement simulated boot success failure and power-cut points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Healthy requires committed boot confirmation
  • Rollback remains visible
  • Unknown outcomes are not counted successful

Implementation constraints

  • Reports describe simulator outcomes, not real-device certification.

Verification to include

  • Complete one simulated update
  • Interrupt another before boot confirmation

Deliverables

  • Update status report and consistency checks

Rollout and recovery

Hide aggregate success if per-device authority is unresolved.

Value of the work

For the engineer: Practice update state machines and recoverable activation.

For the team: Inspect whether an engineer can prevent partial rollout from stranding devices under declared conditions.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.